Building acceptance is today: what you must not forget

Under time pressure, only what you can still save counts. After signing, you often have to prove that a defect was already there. This list protects you from the most expensive mistakes.

The most expensive mistakes at today's building acceptance

Signing without a complete walk-through

Skipping rooms means missing basement, plant room, attic and outdoor areas. That is exactly where costly remaining defects often lie.

Visual defects and verbal promises

Undocumented damages are hard to prove later (glass, ceramics, floors). Also "we'll still do it" does not count: only what is in the protocol holds.

Functions not tested

Windows, doors, water, lights, sockets and RCDs: without a quick function check, failures remain your problem.

Missing deadlines for defect rectification

Without a concrete date, it stays open when defects will be fixed. Every point needs place, description and deadline.

What you must check now and put in the protocol

  1. Fast room-by-room walk-through

    Every room with an overview photo; skip nothing, including plant room and basement.

  2. Photograph the most obvious defects twice immediately

    Once for location, once detail with a scale (e.g. coin) — before anyone says "it's fine".

  3. Numbered list with room and component

    Short and concrete so the protocol can be filled point by point.

  4. Read the protocol before signing

    Every point, every deadline, take a copy. Only then sign.

  5. Record meter readings and keys

    Read and photograph electricity, water and heat. Enter key count directly into the protocol.

Before you sign

Upload your photos and have the critical points placed systematically before the protocol is signed.