Signing without a complete walk-through
Skipping rooms means missing basement, plant room, attic and outdoor areas. That is exactly where costly remaining defects often lie.
Under time pressure, only what you can still save counts. After signing, you often have to prove that a defect was already there. This list protects you from the most expensive mistakes.
Skipping rooms means missing basement, plant room, attic and outdoor areas. That is exactly where costly remaining defects often lie.
Undocumented damages are hard to prove later (glass, ceramics, floors). Also "we'll still do it" does not count: only what is in the protocol holds.
Windows, doors, water, lights, sockets and RCDs: without a quick function check, failures remain your problem.
Without a concrete date, it stays open when defects will be fixed. Every point needs place, description and deadline.
Every room with an overview photo; skip nothing, including plant room and basement.
Once for location, once detail with a scale (e.g. coin) — before anyone says "it's fine".
Short and concrete so the protocol can be filled point by point.
Every point, every deadline, take a copy. Only then sign.
Read and photograph electricity, water and heat. Enter key count directly into the protocol.
Upload your photos and have the critical points placed systematically before the protocol is signed.