Reinforcement before pouring, membranes before covering, window joints before render: what is covered tomorrow is expensive to clarify later.
Whether several trades are working at once or you find it hard to place the exact stage: do not get lost in technical detail. On your walk, focus on the shell and envelope areas that become most expensive once they are covered.
Reinforcement before pouring, membranes before covering, window joints before render: what is covered tomorrow is expensive to clarify later.
Masonry to roof, window to facade, slab to wall: look out for open joints and loose membrane edges here. This is exactly where blame is shifted later.
Membranes, insulation or fresh connections damaged by the next trade belong in the record immediately with photo and location.
Ask what will be poured or rendered in the next few days. This answer determines where you photograph today.
Go specifically where concrete, membrane or render follows tomorrow — do not photograph the whole site.
Photograph the spot first as an overview and then up close with a size reference (e.g. folding rule).
A short list with damage, exact location and affected trade — this helps later when clarifying.
Upload your photos. You will then see what counts immediately and what belongs in a detail checklist.