Chased walls and structure
Horizontal or particularly deep chases in load-bearing walls are tricky. Photograph and inform site management before plastering.
Whether several trades are working at once or you find it hard to place the exact stage: do not get lost in technical details now. On your walk, focus on the building-services spots that become most expensive once plaster or floor build-up follows.
Horizontal or particularly deep chases in load-bearing walls are tricky. Photograph and inform site management before plastering.
Kinked, damaged or overlapping pipes and cables can only be repaired with great effort after the floor build-up.
Missing caps allow construction debris into pipes, causing hard-to-reach blockages later.
Cable offcuts under pipes or holes in vapour barriers are happily poured over — later causing poor sound insulation, cracks and disputes.
Photograph open chases, floor services and pre-walls before they are covered. Ignore already finished areas.
Photograph the room first, then the spot with a folding rule for scale. Note the location and working area.
Check the tight fit of pipe caps and photograph any missing protective covers.
Inform site management in writing and request clarification before work continues.
Upload your photos. You receive an assessment of what counts immediately and which detail sheet fits next.