Treating partial work as complete
"Already better" is not "fixed". Check the protocol item against the original defect, not the overall impression.
The most dangerous state is the mixed one: some things look finished, others do not — and nobody records what counts. That is when deadlines and responsibilities blur. Separate fixed and open items clearly before anything is treated as done.
"Already better" is not "fixed". Check the protocol item against the original defect, not the overall impression.
If fixed and open items sit in one unclear note, it is hard later to prove what was agreed.
Remedies can damage adjoining surfaces. Record that as a new or added item.
What counts as fixed should be traceable with date and photo — not only verbally.
Assign each entry clearly and mark it as fixed, partial, or open.
Photograph overview and detail for each completed item. Always record the current date.
Document what is still missing as concretely as possible — location, remaining defect, and concrete date for re-inspection.
Do not squeeze consequential damage into old items, but clearly add them as new concerns.
Send the list of fixed and open items to the responsible person. Request a receipt confirmation.
Upload photos of fixed and open items. We help you place the current status.