Mixing pre-acceptance and acceptance
Your walk-through is only preparation. Only with acceptance does the risk transfer to you and the periods for defect claims start. Separate the two in your schedule.
The earlier you have a structure, the calmer your own walk-through will be. Use the time now for lists, documents and dates — not just the week before acceptance.
Your walk-through is only preparation. Only with acceptance does the risk transfer to you and the periods for defect claims start. Separate the two in your schedule.
Without a date, pre-acceptance often slips to the day before the official appointment. Exactly when calm is missing.
Drawings, remaining-work lists and earlier photos should be ready beforehand. Do not just gather them on the way.
Deliberately plan function checks and plant rooms too. Do not just pay attention to visible surfaces.
Set your own walk-through at least 1-2 weeks before the official appointment. This leaves time to document issues without pressure.
Create a simple table: one room per row, plus technical areas (heating, plumbing, electrical). Space on the right for notes.
Find an overview photo from the construction phase for each room. Pay special attention to pipes and connections that are covered today.
Anything you already notice belongs on a provisional list. Later you will expand this systematically.
Upload existing photos. We help you place the next steps before official acceptance.