Starting the walk-through without a plan
Without a list of all rooms and areas, the search remains random. Decide beforehand what you will inspect and in what order.
A few days are enough to proceed calmly — if you do not start only on the day itself. Pre-acceptance is for your preparation: your own list, photos, open questions. The official appointment later is the formal step.
Without a list of all rooms and areas, the search remains random. Decide beforehand what you will inspect and in what order.
Without an exact location, an issue can hardly be tracked later. Always note the room and exact position.
Appearance is checked quickly. Windows, doors, water, lighting and sockets need deliberate time during the walk-through.
Verbal agreements do not count later. Only what is in the official acceptance protocol remains verifiably open.
Note every room plus basement, facade and exterior areas, and determine the order in which you will inspect them.
Have drawings, earlier photos and lists of remaining work ready.
Walk through the rooms, test functions (light, water, windows) and record each item with location, brief description, overview and detail photo.
Mark what absolutely must be raised before signing.
Upload your photos and bundle open points in a structured way for the official acceptance.