Prewall installation is open: every detail counts now

Fixings, connections and installation heights are still visible now. After boarding, only a small access remains. Therefore, photograph the entire assembly and all details today.

The most common expensive defects in the prewall installation

Support frames fixed too weakly

A wall-hung WC must carry substantial loads. If the frames are not correctly connected to floor and wall, the whole prewall works loose.

Incorrect connection heights

If the heights for basin, WC or shower are incorrect, the ordered ceramics will not fit later or will sit visibly crooked.

Missing acoustic decoupling

Without decoupling, every flush is transmitted to the adjacent room. This is practically impossible to fix in the finished bathroom.

Leaking or untested connections

Every connection behind the boarding must be tested and recorded before closing up.

What you should document and check now in the prewall installation

  1. The entire element from the front

    Photograph the open prewall completely so that all connections are in the picture.

  2. Fixings to floor and wall

    Take close-up photos of the screw connections on all support feet as well as the wall brackets.

  3. Connection heights with a measuring tape

    Record the height of WC, basin, fittings and drain, each with a visible measuring tool.

  4. Cistern and inspection hatch

    Document the type, connection and the later accessibility of the inspection hatch.

  5. Leak test and decoupling

    Secure the test report of the pipes. Additionally, photograph the acoustic decoupling on the frame and pipes.

Before the boarding goes on

Upload your photos and receive a structured evaluation on fixings, heights and connections.