Floor build-up before screed
Insulation, edge strips and heating loops disappear with the screed. Document damage or gaps now — later it is no longer possible.
Whether several trades are working at once or you find it hard to place the exact stage: do not get lost in technical detail. On your walk, focus on the interior spots that become most expensive once they are covered.
Insulation, edge strips and heating loops disappear with the screed. Document damage or gaps now — later it is no longer possible.
Drywall open on one side or unplastered connections are the last chance to secure services and insulation in the wall.
Waterproofing, corners and drains must be fully documented before tiling — otherwise there will only be disputes over invisible layers.
Fresh screed, open waterproofing or finished boards damaged by the next trade belong in the record immediately.
Check areas first that will be closed, covered or tiled next.
Always photograph transitions like floor/wall or bathroom/hall in overview and detail.
Check per room: what will be covered here next? Photograph these spots first.
Email photos with date and room to site management — before the next work step. Afterwards the state can no longer be proven.
Upload your photos — you immediately see which detail checklist fits your stage.